Product Description
Item name | Sheet Metal Fabrication Sheet Metal Bending Stamping Pipe Clamps Spring Clips |
Material | Stainless steel, SPCC, carbon steel, brass, aluminum, carbon steel, alloy steel etc. |
Mold Type | Progressive tool |
Surface Treatment | Zn-plating, Ni-plating, Cr-plating, Tin-plating, copper-plating, the wreath oxygen resin spraying, the heat disposing, hot-dipgalvanizing, black oxide coating, painting, powdering, color zinc-plated, blue black zinc-plated, rust preventive oil, titanium
alloy galvanized, silver plating, plastic, electroplating, anodizing etc. |
Tolerance | as per customers' requirement |
Quality Assurance | 100% inspection before shipment |
Process | Stamping, machining, bending, deep drawing, welding, riveting |
Mass production | 21 working days for the new mold and within 7 working days for exiting model after receipt of deposit. (Depends on the QTY) |
Custom Metal Stamped Clips Capabilities
No matter you need a single prototype or 5,000,000 parts, Mingxing’ ISO 9001 and IATF 16949 certified facilities can produce the perfect custom clip to meet your demands. Mingxing offers all the latest technological innovations like CAD/CAM, five EDM and CNC machines, and full team of the most experienced tool and die makers in the industry. In addition, we collect data across all manufacturing stages to facilitate final inspection before delivery, which means you get the highest levels of quality available.
Our Advantages
1. Small MOQ is acceptable
2. Assembly service is available
3. Professional sales team to offer the best pre - sales and after- sales service
4. Professional engineers team can offer the design and adjustment on the part shape, raw material and production processes to save cost for customer projects
Q. Are you a factory or a trade company?
A:We're a factory with over 20 years experience in the heat sink field.It is a enterprise that professionally design and produce Heat sinks, electronic components, auto parts and other stamping products.
Q. How to get a quotation?
A: Please send us info such as drawing,material surface finish,quantity.
Q. What about the lead time?
A: Average for 12 working days, open mould for 7 days and mass production for 10 days
Q. Do the products of all the colors are the same with same surface treatment?
A: No. about powder coating, the bright-color will higher than white or gray. About the Anodizing, colorful will higher than silver, and black higher than colorful.