Products Description
Material Standard | GB : T2 Copper with Min. 99.9% DIN: E-Cu58 (Number: 2.0065) EN: Cu-ETP ( Number: CW004A) ISO: Cu-ETP UNS: C11000 JIS: C1100 BS: C101 Other Material also can be customized |
Resistance | 0.00001Ω |
Conductivity | 57% |
Copper Foil of Single Layer Thickness |
0.1/0.2/0.3/0.5/1.0mm,depend on bus bar structure, we will advise suitable thickness |
Insulation Material | PVC Dipping Coating is good performance, Special shaped bus bar can be put on directly, it is not easy to break when it be bent with many times. |
Insulation Performance | PE and PVC are good, PVC dipping is better than PE heat shrink tubes |
Flame Retardant/Fire Resistance | UL94-V-0 or upon you request |
Leakage Testing | PVC Dipping Sleeves: In condition of 3500VDC with 30s upon thickness 1.5mm, Leakage is 0.025 MA; In condition of 5000 VAC with 30s to 60s upon thickness 1.8mm to 2.0mm, Leakage is 0.065 MA; Or upon your working voltage, we advise to choose better solution. |
Surface Plating | Nickel, tin or silver plated etc Plating Thickness:Normally 3um to 12um or upon customers' request |
Salt Spray Testing | In a neutral environment, nickel can bear 240 hours. Silver is lower, tin is lowest |
Bending Testing | Bend 10000 times in 15 radian angle without breakage or fracture. |
Temperature Rise Testing | Depend on flexible busbar cross-sectional area, We can offer all temperature rising test report before delivery if you request |
Operating Temperature | -45 to +150 ºC |
Copper Foil Tensile Strength | ≥500N |
Quote Time | Quotation sheet will be sent in 1-3 working days when receive your enqiury |
Sample/Trial Order Delivery Time |
In 5 -15 working days according to different bus bar structure and manufacture process |
Quality Management Standard | Meet Auto Industry IATF 16949 |
Eco-friendly Certificate | ROHS, REACH |
Quality Control
1) Checking the raw material after they reach our factory------- Incoming quality control ( IQC)
2) Checking the details before the production line operated
3) Have full inspection and routing inspection during mass production---In process quality control(IPQC)
4) Checking the goods after they are finished---- Final quality control(FQC)
5) Checking the goods after they are finished-----Outgoing quality control(OQC)
Why Choose Us
1.Speed up delivery, except for special processes.
2.The price drops straight, and there is no need to open molds for small quantity.
3.Quality assurance, system management, complete certification.
4.Raw material guarantee, strict inspection of all raw materials.